[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"tenantData":3,"i-afm:deposits":4,"i-afm:cards":9,"i-afm:cards-credit":11,"i-afm:cards-debit":13,"i-afm:loans":15,"i-afm:loans-consumer":17,"i-afm:loans-student":19,"i-afm:loans-gold":21,"i-afm:loans-online":23,"i-afm:mortgages":25,"i-afm:journal":27,"i-lucide:menu":29,"i-material-symbols-light:check-circle-outline":32,"i-material-symbols-light:balance":34,"i-material-symbols-light:update":36,"i-material-symbols-light:lock-outline":38,"i-material-symbols-light:flag-outline":40,"i-afm-brands:telegram":42,"i-afm-brands:facebook":45,"i-afm-brands:instagram":47,"i-afm-brands:linkedin":49,"i-lucide:copyright":51,"newsData:\u002Fen\u002Fjournal\u002Fmortgage\u002Fapartment-renovation-budget-how-to-calculate-costs-and-avoid-unexpected-expenses:{\"main\":{\"c\":\"journal\",\"t\":\"mortgage\",\"a\":\"apartment-renovation-budget-how-to-calculate-costs-and-avoid-unexpected-expenses\",\"l\":null},\"sidebar\":{\"mode\":\"none\",\"limit\":10,\"ex\":true,\"c\":\"journal\",\"t\":\"mortgage\"},\"skip\":{\"list\":true,\"sidebar\":true,\"categories\":true,\"topics\":true}}":53,"i-material-symbols-light:home-rounded":96,"i-lucide:chevron-right":98,"i-afm:eye":100},true,{"left":5,"top":5,"width":6,"height":6,"rotate":5,"vFlip":7,"hFlip":7,"body":8},0,18,false,"\u003Cg fill=\"none\">\u003Cpath stroke=\"currentColor\" stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\".933\" d=\"M9.149 2.4c-2.106 0-3.471 1.414-5.085 1.929-.657.21-.985.314-1.118.462-.133.147-.172.363-.25.794-.832 4.618.988 8.886 5.328 10.548.465.178.698.267 1.127.267.428 0 .662-.09 1.128-.268 4.34-1.66 6.157-5.93 5.324-10.547-.077-.43-.117-.647-.25-.795-.133-.148-.46-.252-1.117-.461C12.621 3.814 11.254 2.4 9.15 2.4Z\"\u002F>\u003Cpath stroke=\"currentColor\" stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\".933\" d=\"M7.924 7.971c0-.042.006-.284.007-.588 0-.278-.023-.546.11-.79.497-.99 1.925-.89 2.277.118.061.166.065.429.063.672-.002.31.005.588.005.588m-2.4.295a1.23 1.23 0 0 0-1.219.882c-.084.336-.084 1.554-.033 2.058.168.63.588.89 1 .974.377.034 1.973.021 2.435.021.672.013 1.176-.239 1.386-.995.042-.252.084-1.638-.02-2.058a1.23 1.23 0 0 0-1.198-.882H7.985Z\"\u002F>\u003C\u002Fg>",{"left":5,"top":5,"width":6,"height":6,"rotate":5,"vFlip":7,"hFlip":7,"body":10},"\u003Cg fill=\"none\">\u003Cpath stroke=\"currentColor\" stroke-linecap=\"round\" stroke-linejoin=\"round\" d=\"M16.5 7.15v6a1.5 1.5 0 0 1-1.5 1.5H3a1.5 1.5 0 0 1-1.5-1.5v-7.5A1.5 1.5 0 0 1 3 4.15h12a1.5 1.5 0 0 1 1.5 1.5v1.5Zm0 0h-12\"\u002F>\u003C\u002Fg>",{"left":5,"top":5,"width":6,"height":6,"rotate":5,"vFlip":7,"hFlip":7,"body":12},"\u003Cg fill=\"none\">\u003Cpath stroke=\"currentColor\" d=\"M3.4 14.445V2h11.197v12.445c0 .859-.715 1.555-1.599 1.555H4.999c-.883-.001-1.598-.696-1.599-1.555Z\"\u002F>\u003Cpath stroke=\"currentColor\" d=\"M3.4 4.335H2.2c-.924 0-1.501-.973-1.039-1.75C1.377 2.223 1.771 2 2.2 2h13.597c.924 0 1.501.97 1.039 1.751-.214.36-.61.584-1.039.584h-1.2\"\u002F>\u003Cpath stroke=\"currentColor\" stroke-linecap=\"round\" stroke-linejoin=\"round\" d=\"M11.398 2v14\"\u002F>\u003C\u002Fg>",{"left":5,"top":5,"width":6,"height":6,"rotate":5,"vFlip":7,"hFlip":7,"body":14},"\u003Cg fill=\"none\">\u003Cpath fill=\"currentColor\" d=\"M9.002 1.642a1.5 1.5 0 0 1 2.176-.307l3.27 2.655A1.5 1.5 0 0 1 14.741 6h-1.22l.39-.559a.5.5 0 0 0-.094-.675l-1.685-1.367-1.794 2.603H9.12l2.235-3.232-.809-.657a.5.5 0 0 0-.725.102l-2.64 3.784H5.96zM12.5 12a.5.5 0 0 0 0 1h1a.5.5 0 0 0 0-1zm-9-7h2.17l-.701 1H3.5a.5.5 0 0 0 0 1H14c1.106 0 2.001.895 2 2v6c0 1.104-.895 2-2 2.001H4.5A2.5 2.5 0 0 1 2 14.5v-8A1.5 1.5 0 0 1 3.5 5M3 14.5A1.5 1.5 0 0 0 4.5 16H14a1 1 0 0 0 1.001-1V9A1 1 0 0 0 14 8H3.499Q3.235 8 3 7.915z\"\u002F>\u003C\u002Fg>",{"left":5,"top":5,"width":6,"height":6,"rotate":5,"vFlip":7,"hFlip":7,"body":16},"\u003Cg fill=\"none\">\u003Cpath d=\"M12.3 5.20002C12.3 3.88002 12.3 3.22002 11.889 2.81002C11.479 2.40002 10.819 2.40002 9.499 2.40002C8.179 2.40002 7.519 2.40002 7.109 2.81002C6.699 3.22002 6.699 3.88002 6.699 5.20002M2.5 10.801C2.5 8.16102 2.5 6.84102 3.32 6.02102C4.14 5.20102 5.46 5.20102 8.1 5.20102H10.9C13.54 5.20102 14.86 5.20102 15.68 6.02102C16.5 6.84202 16.5 8.16102 16.5 10.801C16.5 13.441 16.5 14.761 15.68 15.581C14.86 16.401 13.54 16.401 10.9 16.401H8.1C5.46 16.401 4.14 16.401 3.32 15.581C2.5 14.761 2.5 13.441 2.5 10.801Z\" stroke=\"currentColor\" stroke-width=\"0.933\"\u002F>\n\u003Cpath d=\"M8.94434 7.34961C9.50648 7.34961 10.0408 7.60448 10.4316 8.04883C10.8219 8.49255 11.0391 9.09069 11.0391 9.71094V9.87598H11.7227C11.8425 9.87611 11.9531 9.9307 12.0312 10.0195C12.1089 10.1078 12.1503 10.2241 12.1504 10.3418C12.1504 10.4595 12.1089 10.5757 12.0312 10.6641C11.953 10.753 11.8426 10.8075 11.7227 10.8076H11.0391V11.3184H11.7227C11.8425 11.3185 11.9531 11.3731 12.0312 11.4619C12.1089 11.5502 12.1503 11.6665 12.1504 11.7842C12.1504 11.9018 12.1089 12.0181 12.0312 12.1064C11.953 12.1954 11.8426 12.2499 11.7227 12.25H11.0391V13.1846C11.039 13.3022 10.9976 13.4185 10.9199 13.5068C10.8417 13.5956 10.7312 13.6503 10.6113 13.6504C10.4912 13.6504 10.3801 13.5958 10.3018 13.5068C10.2241 13.4185 10.1837 13.3022 10.1836 13.1846V12.25H9.5C9.37989 12.25 9.2697 12.1955 9.19141 12.1064C9.11367 12.0181 9.07227 11.9019 9.07227 11.7842C9.07235 11.6665 9.11373 11.5502 9.19141 11.4619C9.26969 11.3731 9.38005 11.3184 9.5 11.3184H10.1836V10.8076H9.5C9.37988 10.8076 9.2697 10.7531 9.19141 10.6641C9.11366 10.5757 9.07227 10.4596 9.07227 10.3418C9.07234 10.2241 9.11372 10.1078 9.19141 10.0195C9.26969 9.93072 9.38004 9.87598 9.5 9.87598H10.1836V9.71094C10.1836 9.32619 10.0483 8.9603 9.81348 8.69336C9.57922 8.42709 9.26622 8.28125 8.94434 8.28125C8.62246 8.28128 8.30943 8.42707 8.0752 8.69336C7.84041 8.96029 7.70508 9.3262 7.70508 9.71094C7.70498 9.82856 7.66458 9.94491 7.58691 10.0332C7.50862 10.1221 7.3974 10.1768 7.27734 10.1768C7.15748 10.1766 7.04694 10.122 6.96875 10.0332C6.89109 9.94491 6.8497 9.82856 6.84961 9.71094C6.84961 9.09074 7.06682 8.49254 7.45703 8.04883C7.84786 7.60451 8.38223 7.34964 8.94434 7.34961Z\" fill=\"currentColor\" stroke=\"currentColor\" stroke-width=\"0.3\"\u002F>\u003C\u002Fg>",{"left":5,"top":5,"width":6,"height":6,"rotate":5,"vFlip":7,"hFlip":7,"body":18},"\u003Cdefs>\u003CclipPath id=\"clip0_4380_230525\">\n\u003Crect width=\"18\" height=\"18\" fill=\"white\"\u002F>\n\u003C\u002FclipPath>\u003C\u002Fdefs>\u003Cg fill=\"none\">\u003Cg clip-path=\"url(#clip0_4380_230525)\">\n\u003Cpath d=\"M12.2 4.2C12.2 2.692 12.2 1.939 11.732 1.468C11.261 1 10.508 1 9 1C7.492 1 6.739 1 6.268 1.468C5.8 1.939 5.8 2.692 5.8 4.2M1 10.6C1 7.796 1 6.392 1.725 5.448C1.86033 5.27467 2.00833 5.11633 2.169 4.973C3.058 4.2 4.371 4.2 7 4.2H11C13.629 4.2 14.947 4.2 15.831 4.972C15.991 5.11533 16.139 5.274 16.275 5.448C17 6.392 17 7.796 17 10.6C17 13.404 17 14.808 16.275 15.752C16.1425 15.9242 15.9938 16.0832 15.831 16.227C14.946 17 13.629 17 11 17H7C4.372 17 3.053 17 2.169 16.228C2.00612 16.0839 1.85744 15.9245 1.725 15.752C1 14.808 1 13.404 1 10.6Z\" stroke=\"currentColor\" stroke-linecap=\"round\" stroke-linejoin=\"round\"\u002F>\n\u003Cpath d=\"M5.4 9H3M15 9H12.6\" stroke=\"currentColor\" stroke-linecap=\"round\" stroke-linejoin=\"round\"\u002F>\n\u003Cpath d=\"M8.69141 6.84949C9.19039 6.84949 9.66189 7.09115 10.0039 7.50769C10.3452 7.92346 10.5332 8.48273 10.5332 9.06042V9.20496H11.1084C11.2227 9.2051 11.3245 9.26034 11.3945 9.34558C11.464 9.43016 11.5 9.53997 11.5 9.64929C11.4999 9.75848 11.4639 9.86755 11.3945 9.95203C11.3245 10.0373 11.2227 10.0935 11.1084 10.0936H10.5332V10.5487H11.1084C11.2227 10.5488 11.3245 10.605 11.3945 10.6903C11.4639 10.7748 11.4999 10.8838 11.5 10.993C11.5 11.1024 11.464 11.2122 11.3945 11.2968C11.3245 11.3819 11.2226 11.4372 11.1084 11.4374H10.5332V12.2977C10.5332 12.4071 10.4972 12.5169 10.4277 12.6014C10.3577 12.6866 10.2558 12.742 10.1416 12.7421C10.0272 12.7421 9.92461 12.6868 9.85449 12.6014C9.78505 12.5169 9.75 12.4071 9.75 12.2977V11.4374H9.1748C9.06031 11.4374 8.95782 11.3822 8.8877 11.2968C8.81829 11.2122 8.7832 11.1023 8.7832 10.993C8.78326 10.884 8.81849 10.7748 8.8877 10.6903C8.95782 10.6049 9.06031 10.5487 9.1748 10.5487H9.75V10.0936H9.1748C9.06031 10.0936 8.95782 10.0374 8.8877 9.95203C8.81848 9.86758 8.78329 9.75837 8.7832 9.64929C8.7832 9.54004 8.81834 9.43014 8.8877 9.34558C8.95782 9.26017 9.06031 9.20496 9.1748 9.20496H9.75V9.06042C9.75 8.70141 9.63211 8.36171 9.42969 8.11511C9.22791 7.86933 8.96144 7.73816 8.69141 7.73816C8.42141 7.73819 8.15488 7.86937 7.95312 8.11511C7.75076 8.36171 7.63281 8.70147 7.63281 9.06042C7.63277 9.16961 7.59763 9.27865 7.52832 9.36316C7.4582 9.44857 7.3557 9.50476 7.24121 9.50476C7.12689 9.50462 7.02511 9.44846 6.95508 9.36316C6.88574 9.27865 6.84965 9.16963 6.84961 9.06042C6.84961 8.48273 7.03854 7.92346 7.37988 7.50769C7.72185 7.0914 8.19261 6.84952 8.69141 6.84949Z\" fill=\"currentColor\" stroke=\"currentColor\" stroke-width=\"0.3\"\u002F>\n\u003C\u002Fg>\u003C\u002Fg>",{"left":5,"top":5,"width":6,"height":6,"rotate":5,"vFlip":7,"hFlip":7,"body":20},"\u003Cg fill=\"none\">\u003Cpath stroke=\"currentColor\" stroke-linecap=\"round\" stroke-linejoin=\"round\" d=\"M17.001 4.533 9.847 1.23a2.52 2.52 0 0 0-2.044-.026L1.381 3.956a.628.628 0 0 0 0 1.155l3.052 1.308v2.513m12.568-4.399L13.23 6.419v2.513m3.771-4.399v3.77m-12.568.629s1.466-.629 4.398-.629c2.933 0 4.399.629 4.399.629m-8.797 0v1.256c0 3.387 3.666 5.505 6.598 3.81a4.4 4.4 0 0 0 2.199-3.81V8.932\"\u002F>\n\u003Cpath stroke=\"currentColor\" stroke-linecap=\"round\" stroke-linejoin=\"round\" d=\"M4.769 17.303c1.296-3.129 5.492-3.681 7.553-.994q.351.46.575.994\"\u002F>\u003C\u002Fg>",{"left":5,"top":5,"width":6,"height":6,"rotate":5,"vFlip":7,"hFlip":7,"body":22},"\u003Cg fill=\"none\">\u003Cpath stroke=\"currentColor\" stroke-linecap=\"round\" stroke-linejoin=\"round\" d=\"M7.351 10.137a1.23 1.23 0 0 0-1.231-.982H3.24a1.23 1.23 0 0 0-1.231.982L1 15.308h7.387zm8.613 0a1.226 1.226 0 0 0-1.231-.982h-2.88a1.22 1.22 0 0 0-1.226.982l-1.014 5.171H17z\"\u002F>\u003Cpath stroke=\"currentColor\" stroke-linecap=\"round\" stroke-linejoin=\"round\" d=\"m12.693 9.155-1.035-5.169A1.23 1.23 0 0 0 10.427 3h-2.88a1.23 1.23 0 0 0-1.231.986L5.307 9.155m.839 0h5.708\"\u002F>\u003C\u002Fg>",{"left":5,"top":5,"width":6,"height":6,"rotate":5,"vFlip":7,"hFlip":7,"body":24},"\u003Cg fill=\"none\">\u003Cpath d=\"M13.333 1.84949C14.0044 1.84949 14.639 2.18737 15.1006 2.77039C15.5614 3.35249 15.8164 4.13563 15.8164 4.94714V5.21863H16.667C16.8077 5.21874 16.9331 5.28935 17.0195 5.39832C17.1052 5.50658 17.1503 5.64751 17.1504 5.78894C17.1504 5.93051 17.1053 6.07218 17.0195 6.18054C16.9331 6.28945 16.8077 6.36012 16.667 6.36023H15.8164V7.14148H16.667C16.8079 7.14159 16.9331 7.21299 17.0195 7.32214C17.1053 7.43051 17.1504 7.57121 17.1504 7.71277C17.1504 7.85427 17.1053 7.99508 17.0195 8.10339C16.9331 8.21244 16.8078 8.28395 16.667 8.28406H15.8164V9.57898C15.8164 9.7205 15.7723 9.86128 15.6865 9.9696C15.6 10.0788 15.474 10.1503 15.333 10.1503C15.1922 10.1502 15.0669 10.0787 14.9805 9.9696C14.8947 9.86128 14.8496 9.7205 14.8496 9.57898V8.28406H14C13.859 8.28406 13.733 8.21263 13.6465 8.10339C13.5608 7.99509 13.5166 7.85422 13.5166 7.71277C13.5166 7.57135 13.5609 7.43046 13.6465 7.32214C13.733 7.2129 13.859 7.14148 14 7.14148H14.8496V6.36023H14C13.859 6.36023 13.733 6.28972 13.6465 6.18054C13.5607 6.07218 13.5166 5.93051 13.5166 5.78894C13.5167 5.64751 13.5608 5.50658 13.6465 5.39832C13.733 5.28909 13.859 5.21863 14 5.21863H14.8496V4.94714C14.8496 4.41878 14.6837 3.91701 14.3945 3.55164C14.1059 3.1871 13.7224 2.99207 13.333 2.99207C12.9437 2.99217 12.561 3.18724 12.2725 3.55164C11.9832 3.91702 11.8164 4.41873 11.8164 4.94714C11.8164 5.08865 11.7722 5.22942 11.6865 5.33777C11.6 5.44701 11.474 5.51843 11.333 5.51843C11.1921 5.51832 11.0669 5.44691 10.9805 5.33777C10.8947 5.2294 10.8496 5.08871 10.8496 4.94714C10.8496 4.13578 11.1048 3.35246 11.5654 2.77039C12.0269 2.18746 12.6617 1.8496 13.333 1.84949Z\" fill=\"currentColor\" stroke=\"currentColor\" stroke-width=\"0.3\"\u002F>\n\u003Cpath d=\"M9.74066 3.80701C10.4237 3.86601 10.4677 4.70001 9.87666 4.86301H2.97866V13.609H14.5707V11.803L14.5757 11.745C14.6487 11.115 15.6287 11.113 15.7437 11.692V14.033C15.7437 14.38 15.4297 14.663 15.0387 14.663H2.50866C2.12066 14.663 1.80566 14.38 1.80566 14.033V4.86301C1.80566 4.28001 2.33066 3.80701 2.97866 3.80701H9.74066Z\" fill=\"currentColor\"\u002F>\n\u003Cpath d=\"M3.2627 15.551L14.2837 15.565\" stroke=\"currentColor\" stroke-linecap=\"round\"\u002F>\n\u003Cpath d=\"M2.31323 14.364L1.08423 16.201C0.850229 16.553 1.13123 17 1.58923 17H15.9632C16.4162 17 16.6992 16.553 16.4632 16.201L15.2382 14.364\" stroke=\"currentColor\"\u002F>\u003C\u002Fg>",{"left":5,"top":5,"width":6,"height":6,"rotate":5,"vFlip":7,"hFlip":7,"body":26},"\u003Cdefs>\u003CclipPath id=\"a\">\u003Cpath fill=\"currentColor\" d=\"M9.5 9.4h8v8h-8z\"\u002F>\u003C\u002FclipPath>\u003C\u002Fdefs>\u003Cg fill=\"none\">\u003Cpath stroke=\"currentColor\" stroke-linecap=\"round\" stroke-linejoin=\"round\" d=\"M7.25 16.15v-4.5a1.5 1.5 0 0 1 1.5-1.5h1.2\"\u002F>\u003Cpath stroke=\"currentColor\" stroke-linecap=\"round\" stroke-linejoin=\"round\" d=\"m15.5 8.65-6-6L2.75 9.4h1.5v5.25a1.5 1.5 0 0 0 1.5 1.5h3.12\"\u002F>\u003Cg stroke=\"currentColor\" stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\".9\" clip-path=\"url(#a)\">\u003Cpath d=\"m12.334 16.334 4-4M15.833 16.667a.833.833 0 1 0 0-1.667.833.833 0 0 0 0 1.667ZM12.833 13.667a.833.833 0 1 0 0-1.667.833.833 0 0 0 0 1.667Z\"\u002F>\u003C\u002Fg>\u003C\u002Fg>",{"left":5,"top":5,"width":6,"height":6,"rotate":5,"vFlip":7,"hFlip":7,"body":28},"\u003Cg fill=\"none\">\u003Cpath stroke=\"currentColor\" stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"1.043\" d=\"M12.667 11.4v-4c0-1.885 0-2.828-.586-3.414-.586-.586-1.529-.586-3.414-.586H6c-1.885 0-2.829 0-3.414.586C2 4.572 2 5.516 2 7.4v4c0 1.886 0 2.83.586 3.414.585.586 1.529.586 3.414.586h8M4.667 6.734H10M4.667 9.4H10m-5.333 2.667h2.666M14 6.422h.667c.942 0 1.414 0 1.706.293.294.293.294.764.294 1.707v5.333a1.333 1.333 0 1 1-2.667 0V6.422Z\"\u002F>\u003C\u002Fg>",{"left":5,"top":5,"width":30,"height":30,"rotate":5,"vFlip":7,"hFlip":7,"body":31},24,"\u003Cpath fill=\"none\" stroke=\"currentColor\" stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M4 5h16M4 12h16M4 19h16\"\u002F>",{"left":5,"top":5,"width":30,"height":30,"rotate":5,"vFlip":7,"hFlip":7,"body":33},"\u003Cpath fill=\"currentColor\" d=\"m10.562 15.908l6.396-6.396l-.708-.708l-5.688 5.688l-2.85-2.85l-.708.708zM12.003 21q-1.866 0-3.51-.708q-1.643-.709-2.859-1.924t-1.925-2.856T3 12.003t.709-3.51Q4.417 6.85 5.63 5.634t2.857-1.925T11.997 3t3.51.709q1.643.708 2.859 1.922t1.925 2.857t.709 3.509t-.708 3.51t-1.924 2.859t-2.856 1.925t-3.509.709M12 20q3.35 0 5.675-2.325T20 12t-2.325-5.675T12 4T6.325 6.325T4 12t2.325 5.675T12 20m0-8\"\u002F>",{"left":5,"top":5,"width":30,"height":30,"rotate":5,"vFlip":7,"hFlip":7,"body":35},"\u003Cpath fill=\"currentColor\" d=\"M3 20v-1h8.5V7.94q-.708-.129-1.25-.642T9.56 6H6.116L9 13.212q-.058 1-.929 1.702T6 15.616t-2.071-.702T3 13.212L5.885 6H4V5h5.56q.165-.836.834-1.418T12 3t1.606.582T14.44 5H20v1h-1.884L21 13.212q-.058 1-.929 1.702T18 15.616t-2.071-.702T15 13.212L17.884 6h-3.443q-.149.785-.691 1.298t-1.25.643V19H21v1zm12.99-6.884h4.02L18 8.092zm-12 0h4.02L6 8.092zM12 7q.617 0 1.059-.441q.441-.442.441-1.059t-.441-1.059Q12.617 4 12 4t-1.059.441T10.5 5.5t.441 1.059Q11.383 7 12 7\"\u002F>",{"left":5,"top":5,"width":30,"height":30,"rotate":5,"vFlip":7,"hFlip":7,"body":37},"\u003Cpath fill=\"currentColor\" d=\"M12.02 20q-1.664 0-3.119-.626T6.359 17.66t-1.714-2.542T4.02 12t.626-3.118T6.36 6.34T8.9 4.626T12.019 4q1.723 0 3.282.712q1.559.711 2.718 1.984V4.308h1v4.154h-4.153v-1h2.48q-1.044-1.15-2.41-1.806Q13.572 5 12.02 5Q9.094 5 7.057 7.038T5.019 12t2.038 4.963T12.019 19q2.625 0 4.569-1.71t2.35-4.29h1.012q-.356 3.021-2.62 5.01Q15.066 20 12.02 20m3.146-4.146l-3.647-3.646V7h1v4.792l3.354 3.354z\"\u002F>",{"left":5,"top":5,"width":30,"height":30,"rotate":5,"vFlip":7,"hFlip":7,"body":39},"\u003Cpath fill=\"currentColor\" d=\"M6.616 21q-.672 0-1.144-.472T5 19.385v-8.77q0-.67.472-1.143Q5.944 9 6.616 9H8V7q0-1.671 1.165-2.835Q10.329 3 12 3t2.836 1.165T16 7v2h1.385q.67 0 1.143.472q.472.472.472 1.144v8.769q0 .67-.472 1.143q-.472.472-1.143.472zm0-1h10.769q.269 0 .442-.173t.173-.442v-8.77q0-.269-.173-.442T17.385 10H6.615q-.269 0-.442.173T6 10.616v8.769q0 .269.173.442t.443.173m6.45-3.934q.434-.433.434-1.066t-.434-1.066T12 13.5t-1.066.434Q10.5 14.367 10.5 15t.434 1.066q.433.434 1.066.434t1.066-.434M9 9h6V7q0-1.25-.875-2.125T12 4t-2.125.875T9 7zM6 20V10z\"\u002F>",{"left":5,"top":5,"width":30,"height":30,"rotate":5,"vFlip":7,"hFlip":7,"body":41},"\u003Cpath fill=\"currentColor\" d=\"M6 20.5V5h7.192l.4 2H19v8h-5.192l-.4-2H7v7.5zm8.65-6.5H18V8h-5.25l-.4-2H7v6h7.25z\"\u002F>",{"left":5,"top":5,"width":43,"height":43,"rotate":5,"vFlip":7,"hFlip":7,"body":44},32,"\u003Cg fill=\"none\">\u003Cpath fill=\"currentColor\" d=\"m31.4 5.4-4.7 22c-.35 1.55-1.25 1.9-2.55 1.2l-7.05-5.2-3.45 3.3c-.35.35-.7.7-1.5.7l.55-7.25L25.85 8.2c.55-.55-.15-.75-.85-.3L8.65 18.2 1.6 16.05c-1.55-.5-1.55-1.55.35-2.25l27.4-10.65c1.35-.4 2.5.3 2.05 2.25\"\u002F>\u003C\u002Fg>",{"left":5,"top":5,"width":43,"height":43,"rotate":5,"vFlip":7,"hFlip":7,"body":46},"\u003Cdefs>\u003CclipPath id=\"a\">\u003Cpath fill=\"#fff\" d=\"M0 0h32v32H0z\"\u002F>\u003C\u002FclipPath>\u003C\u002Fdefs>\u003Cg fill=\"none\">\u003Cg clip-path=\"url(#a)\">\u003Cpath fill=\"currentColor\" d=\"M23.7 12.9h-3.8V7.8H23c.55 0 1-.4 1-1V1.5c0-.55-.4-1-1-1h-3.65c-3.95 0-6.7 2.8-6.7 6.95v5.35h-4.4c-.7 0-1.35.55-1.35 1.35v3.6c0 .7.55 1.35 1.35 1.35h4.3v11.05c0 .7.55 1.35 1.35 1.35h4.7c.3 0 .55-.15.75-.35s.35-.55.35-.85V19.15H23c.65 0 1.15-.4 1.25-1v-.1l.7-3.45c.05-.35 0-.75-.3-1.15-.1-.25-.55-.5-.95-.55\"\u002F>\u003C\u002Fg>\u003C\u002Fg>",{"left":5,"top":5,"width":43,"height":43,"rotate":5,"vFlip":7,"hFlip":7,"body":48},"\u003Cg style=\"transform-origin:1.01222px 1.01222px\">\u003Cpath fill=\"currentColor\" d=\"M24.843 6.234c-1.071 0-1.875.803-1.875 1.874 0 1.07.804 1.874 1.875 1.874s1.874-.803 1.874-1.874-.803-1.874-1.874-1.874M16.408 8.643c-4.418 0-7.898 3.615-7.898 7.9s3.614 7.898 7.898 7.898 7.9-3.615 7.9-7.899-3.482-7.899-7.9-7.899m0 12.987a5.085 5.085 0 0 1-5.087-5.088 5.085 5.085 0 0 1 5.087-5.087 5.085 5.085 0 0 1 5.088 5.087 5.085 5.085 0 0 1-5.088 5.088\"\u002F>\u003Cpath fill=\"currentColor\" d=\"M22.834.343H10.116C4.627.343.343 4.627.343 9.983V22.7a9.6 9.6 0 0 0 9.64 9.639H22.7a9.6 9.6 0 0 0 9.639-9.64V9.983c.134-5.355-4.15-9.64-9.506-9.64m6.56 22.491c0 3.615-2.945 6.694-6.693 6.694H9.982c-3.615 0-6.694-2.945-6.694-6.694V10.116c0-3.615 2.946-6.694 6.694-6.694h12.719c3.614 0 6.694 2.945 6.694 6.694z\"\u002F>\u003C\u002Fg>",{"left":5,"top":5,"width":43,"height":43,"rotate":5,"vFlip":7,"hFlip":7,"body":50},"\u003Cg fill=\"none\">\u003Cpath fill=\"currentColor\" d=\"M9.253 6.667a2.667 2.667 0 1 1-5.333-.003 2.667 2.667 0 0 1 5.333.003m.08 4.64H4V28h5.333zm8.427 0h-5.307V28h5.254v-8.76c0-4.88 6.36-5.333 6.36 0V28h5.266V17.427c0-8.227-9.413-7.92-11.626-3.88z\"\u002F>\u003C\u002Fg>",{"left":5,"top":5,"width":30,"height":30,"rotate":5,"vFlip":7,"hFlip":7,"body":52},"\u003Cg fill=\"none\" stroke=\"currentColor\" stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\">\u003Ccircle cx=\"12\" cy=\"12\" r=\"10\"\u002F>\u003Cpath d=\"M14.83 14.83a4 4 0 1 1 0-5.66\"\u002F>\u003C\u002Fg>",{"currentArticle":54},{"data":55},{"id":56,"slug":57,"title":58,"description":59,"original_image":60,"thumbnail_image":61,"image_source":62,"description_source":63,"publication_date":64,"updated_at":65,"views_count":66,"category":67,"topics":70,"author":74,"banners":91,"seo":92},315,"apartment-renovation-budget-how-to-calculate-costs-and-avoid-unexpected-expenses","Apartment Renovation Budget: How to Calculate Costs and Avoid Unexpected Expenses","\u003Cp>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">Apartment renovation often begins with a clear idea of what the final result should look like, but not always with an equally clear financial calculation. The initial budget may seem sufficient, but additional problems that arise during the work, incorrect estimates of material quantities, or unclear agreements with contractors can significantly increase the total cost.\u003C\u002Fspan>\u003C\u002Fp>\u003Cp>\u003Cbr>\u003C\u002Fp>\u003Cp>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">A properly prepared budget is not simply a list of prices for planned work. It should include the cost of materials, contractor fees, delivery and transportation expenses, construction waste removal, possible additional work, and a reserve fund for unforeseen situations.\u003C\u002Fspan>\u003C\u002Fp>\u003Cp>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">In this guide, we explain how to calculate an apartment renovation budget step by step, compare offers, and reduce the likelihood of unexpected expenses.\u003C\u002Fspan>\u003C\u002Fp>\u003Cp>\u003Cbr>\u003C\u002Fp>\u003Ch2>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">1. First, Define the Scope of the Renovation\u003C\u002Fspan>\u003C\u002Fh2>\u003Cp>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">Before calculating the budget, you need to clearly determine what type of renovation is planned. The renovation cost of two apartments with the same area can differ significantly depending on the scope of work and the current condition of the property.\u003C\u002Fspan>\u003C\u002Fp>\u003Cp>\u003Cbr>\u003C\u002Fp>\u003Cp>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">In general, renovation projects can be divided into three main levels.\u003C\u002Fspan>\u003C\u002Fp>\u003Col>\u003Cli data-list=\"bullet\">\u003Cspan class=\"ql-ui\" contenteditable=\"false\">\u003C\u002Fspan>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">Cosmetic renovation – painting walls or installing wallpaper, partial replacement of flooring, and minor restoration work.\u003C\u002Fspan>\u003C\u002Fli>\u003Cli data-list=\"bullet\">\u003Cspan class=\"ql-ui\" contenteditable=\"false\">\u003C\u002Fspan>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">Medium-scale renovation – leveling walls, completely replacing flooring, some plumbing or electrical work, and replacing doors or lighting.\u003C\u002Fspan>\u003C\u002Fli>\u003Cli data-list=\"bullet\">\u003Cspan class=\"ql-ui\" contenteditable=\"false\">\u003C\u002Fspan>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">Major renovation – removing old finishes, replacing electrical and plumbing systems, modifying walls or partitions, and installing heating, ventilation, and other systems.\u003C\u002Fspan>\u003C\u002Fli>\u003C\u002Fol>\u003Cp>\u003Cbr>\u003C\u002Fp>\u003Cp>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">The scope of work should be described in as much detail as possible before requesting quotes from contractors. A phrase such as “complete apartment renovation” is not enough to prepare an accurate estimate. You should specify the number of rooms, total area, ceiling height, planned materials, and the work required in each room.\u003C\u002Fspan>\u003C\u002Fp>\u003Cp>\u003Cbr>\u003C\u002Fp>\u003Ch2>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">2. Prepare a Detailed List of Work\u003C\u002Fspan>\u003C\u002Fh2>\u003Cp>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">To understand the total renovation cost, divide the work into separate stages. This will help you determine how much of the budget will be allocated to each type of work and which expenses are the highest priority.\u003C\u002Fspan>\u003C\u002Fp>\u003Cp>\u003Cbr>\u003C\u002Fp>\u003Cp>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">The list of work may include:\u003C\u002Fspan>\u003C\u002Fp>\u003Col>\u003Cli data-list=\"bullet\">\u003Cspan class=\"ql-ui\" contenteditable=\"false\">\u003C\u002Fspan>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">design and measurements,\u003C\u002Fspan>\u003C\u002Fli>\u003Cli data-list=\"bullet\">\u003Cspan class=\"ql-ui\" contenteditable=\"false\">\u003C\u002Fspan>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">removal of old finishes and structures,\u003C\u002Fspan>\u003C\u002Fli>\u003Cli data-list=\"bullet\">\u003Cspan class=\"ql-ui\" contenteditable=\"false\">\u003C\u002Fspan>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">collection and disposal of construction waste,\u003C\u002Fspan>\u003C\u002Fli>\u003Cli data-list=\"bullet\">\u003Cspan class=\"ql-ui\" contenteditable=\"false\">\u003C\u002Fspan>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">installation of electrical wiring, sockets, and switches,\u003C\u002Fspan>\u003C\u002Fli>\u003Cli data-list=\"bullet\">\u003Cspan class=\"ql-ui\" contenteditable=\"false\">\u003C\u002Fspan>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">water supply and sewage system work,\u003C\u002Fspan>\u003C\u002Fli>\u003Cli data-list=\"bullet\">\u003Cspan class=\"ql-ui\" contenteditable=\"false\">\u003C\u002Fspan>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">installation of heating or ventilation systems,\u003C\u002Fspan>\u003C\u002Fli>\u003Cli data-list=\"bullet\">\u003Cspan class=\"ql-ui\" contenteditable=\"false\">\u003C\u002Fspan>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">leveling walls and ceilings,\u003C\u002Fspan>\u003C\u002Fli>\u003Cli data-list=\"bullet\">\u003Cspan class=\"ql-ui\" contenteditable=\"false\">\u003C\u002Fspan>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">tiling, painting, or wallpaper installation,\u003C\u002Fspan>\u003C\u002Fli>\u003Cli data-list=\"bullet\">\u003Cspan class=\"ql-ui\" contenteditable=\"false\">\u003C\u002Fspan>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">floor preparation and flooring installation,\u003C\u002Fspan>\u003C\u002Fli>\u003Cli data-list=\"bullet\">\u003Cspan class=\"ql-ui\" contenteditable=\"false\">\u003C\u002Fspan>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">installation of interior doors and baseboards,\u003C\u002Fspan>\u003C\u002Fli>\u003Cli data-list=\"bullet\">\u003Cspan class=\"ql-ui\" contenteditable=\"false\">\u003C\u002Fspan>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">installation of plumbing fixtures, lighting, and furniture assembly.\u003C\u002Fspan>\u003C\u002Fli>\u003C\u002Fol>\u003Cp>\u003Cbr>\u003C\u002Fp>\u003Cp>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">It is also useful to specify the unit of measurement for each task, such as square meter, linear meter, item, or complete job. This makes it easier to compare quotes from different contractors.\u003C\u002Fspan>\u003C\u002Fp>\u003Cp>\u003Cbr>\u003C\u002Fp>\u003Ch2>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">3. Calculate Labor and Material Costs Separately\u003C\u002Fspan>\u003C\u002Fh2>\u003Cp>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">It is advisable to list labor and material costs separately in the renovation estimate. When a quote contains only one total amount, it becomes difficult to understand how much is being charged for labor and how much is allocated to materials.\u003C\u002Fspan>\u003C\u002Fp>\u003Cp>\u003Cbr>\u003C\u002Fp>\u003Cp>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">Separating these costs also allows you to evaluate whether it is more cost-effective to purchase materials yourself or leave the purchasing to the contractor. The second option may be convenient if the contractor works with suppliers and can obtain better prices, but you should clarify in advance:\u003C\u002Fspan>\u003C\u002Fp>\u003Col>\u003Cli data-list=\"bullet\">\u003Cspan class=\"ql-ui\" contenteditable=\"false\">\u003C\u002Fspan>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">which manufacturers' materials will be used,\u003C\u002Fspan>\u003C\u002Fli>\u003Cli data-list=\"bullet\">\u003Cspan class=\"ql-ui\" contenteditable=\"false\">\u003C\u002Fspan>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">how much material will be purchased,\u003C\u002Fspan>\u003C\u002Fli>\u003Cli data-list=\"bullet\">\u003Cspan class=\"ql-ui\" contenteditable=\"false\">\u003C\u002Fspan>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">who pays for delivery,\u003C\u002Fspan>\u003C\u002Fli>\u003Cli data-list=\"bullet\">\u003Cspan class=\"ql-ui\" contenteditable=\"false\">\u003C\u002Fspan>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">what happens to unused materials,\u003C\u002Fspan>\u003C\u002Fli>\u003Cli data-list=\"bullet\">\u003Cspan class=\"ql-ui\" contenteditable=\"false\">\u003C\u002Fspan>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">whether invoices or receipts will be provided.\u003C\u002Fspan>\u003C\u002Fli>\u003C\u002Fol>\u003Cp>\u003Cbr>\u003C\u002Fp>\u003Cp>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">Choosing materials based only on the lowest price can result in additional expenses later. Low-quality paint may require more coats, inexpensive plumbing components may need to be replaced sooner, and unsuitable adhesive or mortar may require the work to be done again.\u003C\u002Fspan>\u003C\u002Fp>\u003Cp>\u003Cbr>\u003C\u002Fp>\u003Ch2>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">4. Get Several Comparable Quotes\u003C\u002Fspan>\u003C\u002Fh2>\u003Cp>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">For renovation work, it is advisable to obtain at least three quotes. However, all quotes should be based on the same technical requirements and the same scope of work. Otherwise, the prices will not be directly comparable.\u003C\u002Fspan>\u003C\u002Fp>\u003Cp>\u003Cbr>\u003C\u002Fp>\u003Cp>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">When sending a request to a contractor or construction team, include:\u003C\u002Fspan>\u003C\u002Fp>\u003Col>\u003Cli data-list=\"bullet\">\u003Cspan class=\"ql-ui\" contenteditable=\"false\">\u003C\u002Fspan>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">the apartment address or city,\u003C\u002Fspan>\u003C\u002Fli>\u003Cli data-list=\"bullet\">\u003Cspan class=\"ql-ui\" contenteditable=\"false\">\u003C\u002Fspan>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">the total area and the area to be renovated,\u003C\u002Fspan>\u003C\u002Fli>\u003Cli data-list=\"bullet\">\u003Cspan class=\"ql-ui\" contenteditable=\"false\">\u003C\u002Fspan>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">the current condition of the apartment,\u003C\u002Fspan>\u003C\u002Fli>\u003Cli data-list=\"bullet\">\u003Cspan class=\"ql-ui\" contenteditable=\"false\">\u003C\u002Fspan>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">a detailed list of required work,\u003C\u002Fspan>\u003C\u002Fli>\u003Cli data-list=\"bullet\">\u003Cspan class=\"ql-ui\" contenteditable=\"false\">\u003C\u002Fspan>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">preferred materials or quality level,\u003C\u002Fspan>\u003C\u002Fli>\u003Cli data-list=\"bullet\">\u003Cspan class=\"ql-ui\" contenteditable=\"false\">\u003C\u002Fspan>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">preferred start and completion dates,\u003C\u002Fspan>\u003C\u002Fli>\u003Cli data-list=\"bullet\">\u003Cspan class=\"ql-ui\" contenteditable=\"false\">\u003C\u002Fspan>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">whether the apartment will remain occupied during the renovation.\u003C\u002Fspan>\u003C\u002Fli>\u003C\u002Fol>\u003Cp>\u003Cbr>\u003C\u002Fp>\u003Cp>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">To explore different options, you can browse \u003C\u002Fspan>\u003Ca href=\"https:\u002F\u002Fturn.am\u002Fen\u002Fcategory\u002Fveranvorvogvoum\" rel=\"noopener noreferrer\" target=\"_blank\" style=\"background-color: transparent; color: rgb(31, 31, 31);\">renovation services and professionals\u003C\u002Fa>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\"> on Turn.am, compare published service descriptions, photos, and reviews, and contact suitable service providers.\u003C\u002Fspan>\u003C\u002Fp>\u003Cp>\u003Cbr>\u003C\u002Fp>\u003Cp>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">When comparing prices, pay attention not only to the final amount but also to what is included in the quote. A lower price may exclude demolition, waste removal, transportation of materials, or certain stages of work that may later be charged separately.\u003C\u002Fspan>\u003C\u002Fp>\u003Cp>\u003Cbr>\u003C\u002Fp>\u003Ch2>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">5. Ask for a Detailed Estimate\u003C\u002Fspan>\u003C\u002Fh2>\u003Cp>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">The estimate should clearly specify the names of the tasks, quantities, unit prices, and total costs. General descriptions such as “bathroom renovation” or “electrical work” are not sufficient because they do not explain exactly what is included in the price.\u003C\u002Fspan>\u003C\u002Fp>\u003Cp>\u003Cbr>\u003C\u002Fp>\u003Cp>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">A detailed estimate may have the following structure:\u003C\u002Fspan>\u003C\u002Fp>\u003Cp>\u003Cbr>\u003C\u002Fp>\u003Ctable>\u003Ctbody>\u003Ctr>\u003Ctd data-row=\"1\">\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">Work\u003C\u002Fspan>\u003C\u002Ftd>\u003Ctd data-row=\"1\">\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">Unit\u003C\u002Fspan>\u003C\u002Ftd>\u003Ctd data-row=\"1\">\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">Quantity\u003C\u002Fspan>\u003C\u002Ftd>\u003Ctd data-row=\"1\">\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">Unit Price\u003C\u002Fspan>\u003C\u002Ftd>\u003Ctd data-row=\"1\">\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">Total Cost\u003C\u002Fspan>\u003C\u002Ftd>\u003C\u002Ftr>\u003Ctr>\u003Ctd data-row=\"2\">\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">Removal of old wall covering\u003C\u002Fspan>\u003C\u002Ftd>\u003Ctd data-row=\"2\">\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">m²\u003C\u002Fspan>\u003C\u002Ftd>\u003Ctd data-row=\"2\">\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">based on measurements\u003C\u002Fspan>\u003C\u002Ftd>\u003Ctd data-row=\"2\">\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">according to quote\u003C\u002Fspan>\u003C\u002Ftd>\u003Ctd data-row=\"2\">\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">quantity × unit price\u003C\u002Fspan>\u003C\u002Ftd>\u003C\u002Ftr>\u003Ctr>\u003Ctd data-row=\"3\">\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">Wall leveling\u003C\u002Fspan>\u003C\u002Ftd>\u003Ctd data-row=\"3\">\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">m²\u003C\u002Fspan>\u003C\u002Ftd>\u003Ctd data-row=\"3\">\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">based on measurements\u003C\u002Fspan>\u003C\u002Ftd>\u003Ctd data-row=\"3\">\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">according to quote\u003C\u002Fspan>\u003C\u002Ftd>\u003Ctd data-row=\"3\">\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">quantity × unit price\u003C\u002Fspan>\u003C\u002Ftd>\u003C\u002Ftr>\u003Ctr>\u003Ctd data-row=\"4\">\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">Electrical socket installation\u003C\u002Fspan>\u003C\u002Ftd>\u003Ctd data-row=\"4\">\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">item\u003C\u002Fspan>\u003C\u002Ftd>\u003Ctd data-row=\"4\">\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">according to project\u003C\u002Fspan>\u003C\u002Ftd>\u003Ctd data-row=\"4\">\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">according to quote\u003C\u002Fspan>\u003C\u002Ftd>\u003Ctd data-row=\"4\">\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">quantity × unit price\u003C\u002Fspan>\u003C\u002Ftd>\u003C\u002Ftr>\u003Ctr>\u003Ctd data-row=\"5\">\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">Tile installation\u003C\u002Fspan>\u003C\u002Ftd>\u003Ctd data-row=\"5\">\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">m²\u003C\u002Fspan>\u003C\u002Ftd>\u003Ctd data-row=\"5\">\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">based on measurements\u003C\u002Fspan>\u003C\u002Ftd>\u003Ctd data-row=\"5\">\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">according to quote\u003C\u002Fspan>\u003C\u002Ftd>\u003Ctd data-row=\"5\">\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">quantity × unit price\u003C\u002Fspan>\u003C\u002Ftd>\u003C\u002Ftr>\u003C\u002Ftbody>\u003C\u002Ftable>\u003Cp>\u003Cbr>\u003C\u002Fp>\u003Cp>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">If the estimate needs to be changed during the project, the change should be discussed and approved in advance. A contractor should not perform additional paid work after only providing verbal notice without first stating the cost.\u003C\u002Fspan>\u003C\u002Fp>\u003Cp>\u003Cbr>\u003C\u002Fp>\u003Ch2>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">6. Set Aside a Contingency Budget\u003C\u002Fspan>\u003C\u002Fh2>\u003Cp>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">Even with a detailed estimate, problems may appear during renovation that could not have been identified during the initial inspection. For example, removing wall coverings may reveal signs of moisture, damaged electrical wiring, uneven surfaces, or worn pipes.\u003C\u002Fspan>\u003C\u002Fp>\u003Cp>\u003Cbr>\u003C\u002Fp>\u003Cp>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">For this reason, it is advisable to keep a separate contingency fund in addition to the main budget. For cosmetic renovation, the reserve may be smaller, while for a major renovation of an older apartment, it may need to be larger. In practice, it is often reasonable to keep around 10–20% of the total estimated cost unallocated for possible additional expenses.\u003C\u002Fspan>\u003C\u002Fp>\u003Cp>\u003Cbr>\u003C\u002Fp>\u003Cp>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">For example, if the initial total budget for labor and materials is 5 million AMD, instead of allocating the entire amount to planned work, you could keep approximately 500,000 to 1 million AMD as a financial reserve. This does not mean the money will necessarily be spent. It simply reduces the likelihood of needing to take out a loan, move money from other expenses, or leave the renovation unfinished.\u003C\u002Fspan>\u003C\u002Fp>\u003Cp>\u003Cbr>\u003C\u002Fp>\u003Ch2>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">7. Include Expenses That Are Often Forgotten\u003C\u002Fspan>\u003C\u002Fh2>\u003Cp>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">Renovation budgets are often exceeded not because of the main work, but because of many seemingly small additional expenses. Individually, they may not appear significant, but together they can add up to a considerable amount.\u003C\u002Fspan>\u003C\u002Fp>\u003Cp>\u003Cbr>\u003C\u002Fp>\u003Cp>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">Commonly overlooked expenses include:\u003C\u002Fspan>\u003C\u002Fp>\u003Col>\u003Cli data-list=\"bullet\">\u003Cspan class=\"ql-ui\" contenteditable=\"false\">\u003C\u002Fspan>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">material delivery and carrying materials upstairs,\u003C\u002Fspan>\u003C\u002Fli>\u003Cli data-list=\"bullet\">\u003Cspan class=\"ql-ui\" contenteditable=\"false\">\u003C\u002Fspan>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">construction waste removal,\u003C\u002Fspan>\u003C\u002Fli>\u003Cli data-list=\"bullet\">\u003Cspan class=\"ql-ui\" contenteditable=\"false\">\u003C\u002Fspan>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">rental of tools or special equipment,\u003C\u002Fspan>\u003C\u002Fli>\u003Cli data-list=\"bullet\">\u003Cspan class=\"ql-ui\" contenteditable=\"false\">\u003C\u002Fspan>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">measurements and design work,\u003C\u002Fspan>\u003C\u002Fli>\u003Cli data-list=\"bullet\">\u003Cspan class=\"ql-ui\" contenteditable=\"false\">\u003C\u002Fspan>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">sockets, switches, fasteners, and other small components,\u003C\u002Fspan>\u003C\u002Fli>\u003Cli data-list=\"bullet\">\u003Cspan class=\"ql-ui\" contenteditable=\"false\">\u003C\u002Fspan>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">adhesives, mortar, sealants, and auxiliary materials,\u003C\u002Fspan>\u003C\u002Fli>\u003Cli data-list=\"bullet\">\u003Cspan class=\"ql-ui\" contenteditable=\"false\">\u003C\u002Fspan>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">post-construction cleaning,\u003C\u002Fspan>\u003C\u002Fli>\u003Cli data-list=\"bullet\">\u003Cspan class=\"ql-ui\" contenteditable=\"false\">\u003C\u002Fspan>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">moving or temporarily storing furniture,\u003C\u002Fspan>\u003C\u002Fli>\u003Cli data-list=\"bullet\">\u003Cspan class=\"ql-ui\" contenteditable=\"false\">\u003C\u002Fspan>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">replacing small items damaged during the renovation,\u003C\u002Fspan>\u003C\u002Fli>\u003Cli data-list=\"bullet\">\u003Cspan class=\"ql-ui\" contenteditable=\"false\">\u003C\u002Fspan>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">temporary accommodation if it is not possible to stay in the apartment during renovation.\u003C\u002Fspan>\u003C\u002Fli>\u003C\u002Fol>\u003Cp>\u003Cbr>\u003C\u002Fp>\u003Cp>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">You can create a separate “Logistics and Additional Expenses” section in the estimate for these costs.\u003C\u002Fspan>\u003C\u002Fp>\u003Cp>\u003Cbr>\u003C\u002Fp>\u003Ch2>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">8. Agree on a Clear Payment Schedule\u003C\u002Fspan>\u003C\u002Fh2>\u003Cp>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">Paying the entire amount in advance increases financial risk. It is safer to link payments to the completion of specific stages of work.\u003C\u002Fspan>\u003C\u002Fp>\u003Cp>\u003Cbr>\u003C\u002Fp>\u003Cp>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">A typical payment structure might look like this:\u003C\u002Fspan>\u003C\u002Fp>\u003Col>\u003Cli data-list=\"bullet\">\u003Cspan class=\"ql-ui\" contenteditable=\"false\">\u003C\u002Fspan>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">a limited advance payment to begin work and purchase initial materials,\u003C\u002Fspan>\u003C\u002Fli>\u003Cli data-list=\"bullet\">\u003Cspan class=\"ql-ui\" contenteditable=\"false\">\u003C\u002Fspan>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">payment after demolition and preparation work is completed,\u003C\u002Fspan>\u003C\u002Fli>\u003Cli data-list=\"bullet\">\u003Cspan class=\"ql-ui\" contenteditable=\"false\">\u003C\u002Fspan>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">payment after electrical and plumbing work is completed,\u003C\u002Fspan>\u003C\u002Fli>\u003Cli data-list=\"bullet\">\u003Cspan class=\"ql-ui\" contenteditable=\"false\">\u003C\u002Fspan>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">payment after the main finishing work is completed,\u003C\u002Fspan>\u003C\u002Fli>\u003Cli data-list=\"bullet\">\u003Cspan class=\"ql-ui\" contenteditable=\"false\">\u003C\u002Fspan>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">final payment after the work has been accepted and any defects have been corrected.\u003C\u002Fspan>\u003C\u002Fli>\u003C\u002Fol>\u003Cp>\u003Cbr>\u003C\u002Fp>\u003Cp>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">It is advisable to document every payment. If payment is made in cash, you can request a receipt or other written confirmation. For bank transfers, specify the relevant work or project stage in the payment description.\u003C\u002Fspan>\u003C\u002Fp>\u003Cp>\u003Cbr>\u003C\u002Fp>\u003Ch2>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">9. Put Agreements in Writing\u003C\u002Fspan>\u003C\u002Fh2>\u003Cp>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">Verbal agreements may later be interpreted differently by each party. Even if a separate formal contract is not prepared, the main terms should preferably be recorded in a written message or document.\u003C\u002Fspan>\u003C\u002Fp>\u003Cp>\u003Cbr>\u003C\u002Fp>\u003Cp>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">The written agreement should include:\u003C\u002Fspan>\u003C\u002Fp>\u003Col>\u003Cli data-list=\"bullet\">\u003Cspan class=\"ql-ui\" contenteditable=\"false\">\u003C\u002Fspan>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">the complete list of work to be performed,\u003C\u002Fspan>\u003C\u002Fli>\u003Cli data-list=\"bullet\">\u003Cspan class=\"ql-ui\" contenteditable=\"false\">\u003C\u002Fspan>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">labor and material costs,\u003C\u002Fspan>\u003C\u002Fli>\u003Cli data-list=\"bullet\">\u003Cspan class=\"ql-ui\" contenteditable=\"false\">\u003C\u002Fspan>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">payment terms and stages,\u003C\u002Fspan>\u003C\u002Fli>\u003Cli data-list=\"bullet\">\u003Cspan class=\"ql-ui\" contenteditable=\"false\">\u003C\u002Fspan>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">start and completion dates,\u003C\u002Fspan>\u003C\u002Fli>\u003Cli data-list=\"bullet\">\u003Cspan class=\"ql-ui\" contenteditable=\"false\">\u003C\u002Fspan>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">the party responsible for purchasing materials,\u003C\u002Fspan>\u003C\u002Fli>\u003Cli data-list=\"bullet\">\u003Cspan class=\"ql-ui\" contenteditable=\"false\">\u003C\u002Fspan>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">the procedure for approving additional work,\u003C\u002Fspan>\u003C\u002Fli>\u003Cli data-list=\"bullet\">\u003Cspan class=\"ql-ui\" contenteditable=\"false\">\u003C\u002Fspan>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">conditions for correcting defects,\u003C\u002Fspan>\u003C\u002Fli>\u003Cli data-list=\"bullet\">\u003Cspan class=\"ql-ui\" contenteditable=\"false\">\u003C\u002Fspan>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">a warranty for the work, if provided.\u003C\u002Fspan>\u003C\u002Fli>\u003C\u002Fol>\u003Cp>\u003Cbr>\u003C\u002Fp>\u003Cp>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">It is important to specify that work not included in the estimate may only be performed with the customer's prior approval. For such work, the contractor should provide the additional cost in advance and explain why the work is necessary.\u003C\u002Fspan>\u003C\u002Fp>\u003Cp>\u003Cbr>\u003C\u002Fp>\u003Ch2>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">10. Do Not Choose Based Only on the Lowest Price\u003C\u002Fspan>\u003C\u002Fh2>\u003Cp>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">The lowest quote is not always the most cost-effective option. It may exclude certain stages of the work, assume the use of cheaper materials, or not include the correction of defects after completion.\u003C\u002Fspan>\u003C\u002Fp>\u003Cp>\u003Cbr>\u003C\u002Fp>\u003Cp>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">When choosing a contractor, also evaluate:\u003C\u002Fspan>\u003C\u002Fp>\u003Col>\u003Cli data-list=\"bullet\">\u003Cspan class=\"ql-ui\" contenteditable=\"false\">\u003C\u002Fspan>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">photos of previous work,\u003C\u002Fspan>\u003C\u002Fli>\u003Cli data-list=\"bullet\">\u003Cspan class=\"ql-ui\" contenteditable=\"false\">\u003C\u002Fspan>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">customer reviews,\u003C\u002Fspan>\u003C\u002Fli>\u003Cli data-list=\"bullet\">\u003Cspan class=\"ql-ui\" contenteditable=\"false\">\u003C\u002Fspan>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">the ability to clearly explain the work process,\u003C\u002Fspan>\u003C\u002Fli>\u003Cli data-list=\"bullet\">\u003Cspan class=\"ql-ui\" contenteditable=\"false\">\u003C\u002Fspan>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">the level of detail in the estimate,\u003C\u002Fspan>\u003C\u002Fli>\u003Cli data-list=\"bullet\">\u003Cspan class=\"ql-ui\" contenteditable=\"false\">\u003C\u002Fspan>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">whether the proposed timeline is realistic,\u003C\u002Fspan>\u003C\u002Fli>\u003Cli data-list=\"bullet\">\u003Cspan class=\"ql-ui\" contenteditable=\"false\">\u003C\u002Fspan>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">communication speed and reliability,\u003C\u002Fspan>\u003C\u002Fli>\u003Cli data-list=\"bullet\">\u003Cspan class=\"ql-ui\" contenteditable=\"false\">\u003C\u002Fspan>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">whether a warranty is provided.\u003C\u002Fspan>\u003C\u002Fli>\u003C\u002Fol>\u003Cp>\u003Cbr>\u003C\u002Fp>\u003Cp>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">An unusually low price may also indicate that some parts of the project will later be presented as additional paid services. Therefore, it is important to compare not only the total amounts but also the complete list of work included in each quote.\u003C\u002Fspan>\u003C\u002Fp>\u003Cp>\u003Cbr>\u003C\u002Fp>\u003Ch2>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">11. Track Actual Expenses During the Renovation\u003C\u002Fspan>\u003C\u002Fh2>\u003Cp>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">After preparing the estimate, regularly compare planned costs with actual expenses. You can use a simple spreadsheet with the following columns:\u003C\u002Fspan>\u003C\u002Fp>\u003Col>\u003Cli data-list=\"bullet\">\u003Cspan class=\"ql-ui\" contenteditable=\"false\">\u003C\u002Fspan>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">planned work or purchase,\u003C\u002Fspan>\u003C\u002Fli>\u003Cli data-list=\"bullet\">\u003Cspan class=\"ql-ui\" contenteditable=\"false\">\u003C\u002Fspan>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">estimated amount,\u003C\u002Fspan>\u003C\u002Fli>\u003Cli data-list=\"bullet\">\u003Cspan class=\"ql-ui\" contenteditable=\"false\">\u003C\u002Fspan>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">actual amount paid,\u003C\u002Fspan>\u003C\u002Fli>\u003Cli data-list=\"bullet\">\u003Cspan class=\"ql-ui\" contenteditable=\"false\">\u003C\u002Fspan>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">difference,\u003C\u002Fspan>\u003C\u002Fli>\u003Cli data-list=\"bullet\">\u003Cspan class=\"ql-ui\" contenteditable=\"false\">\u003C\u002Fspan>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">payment date,\u003C\u002Fspan>\u003C\u002Fli>\u003Cli data-list=\"bullet\">\u003Cspan class=\"ql-ui\" contenteditable=\"false\">\u003C\u002Fspan>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">responsible contractor or supplier,\u003C\u002Fspan>\u003C\u002Fli>\u003Cli data-list=\"bullet\">\u003Cspan class=\"ql-ui\" contenteditable=\"false\">\u003C\u002Fspan>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">comments.\u003C\u002Fspan>\u003C\u002Fli>\u003C\u002Fol>\u003Cp>\u003Cbr>\u003C\u002Fp>\u003Cp>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">This approach allows you to identify budget overruns early and adjust future spending if necessary. For example, if the preparation stage costs more than expected, you may temporarily postpone non-essential decorative improvements without reducing the quality of the essential work.\u003C\u002Fspan>\u003C\u002Fp>\u003Cp>\u003Cbr>\u003C\u002Fp>\u003Ch2>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">12. Divide the Budget Into Priority and Non-Priority Expenses\u003C\u002Fspan>\u003C\u002Fh2>\u003Cp>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">Not all renovation work has the same level of importance. Priority should be given to work related to apartment safety, engineering systems, and the quality of subsequent finishing work.\u003C\u002Fspan>\u003C\u002Fp>\u003Cp>\u003Cbr>\u003C\u002Fp>\u003Cp>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">Priority work may include:\u003C\u002Fspan>\u003C\u002Fp>\u003Col>\u003Cli data-list=\"bullet\">\u003Cspan class=\"ql-ui\" contenteditable=\"false\">\u003C\u002Fspan>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">ensuring electrical system safety,\u003C\u002Fspan>\u003C\u002Fli>\u003Cli data-list=\"bullet\">\u003Cspan class=\"ql-ui\" contenteditable=\"false\">\u003C\u002Fspan>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">resolving water supply and sewage problems,\u003C\u002Fspan>\u003C\u002Fli>\u003Cli data-list=\"bullet\">\u003Cspan class=\"ql-ui\" contenteditable=\"false\">\u003C\u002Fspan>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">addressing moisture and thermal insulation issues,\u003C\u002Fspan>\u003C\u002Fli>\u003Cli data-list=\"bullet\">\u003Cspan class=\"ql-ui\" contenteditable=\"false\">\u003C\u002Fspan>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">proper preparation of floors and wall surfaces,\u003C\u002Fspan>\u003C\u002Fli>\u003Cli data-list=\"bullet\">\u003Cspan class=\"ql-ui\" contenteditable=\"false\">\u003C\u002Fspan>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">heating and ventilation systems.\u003C\u002Fspan>\u003C\u002Fli>\u003C\u002Fol>\u003Cp>\u003Cbr>\u003C\u002Fp>\u003Cp>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">Non-priority expenses, such as expensive decorative elements, specialized lighting, or complex designer solutions, can be postponed if the budget is limited.\u003C\u002Fspan>\u003C\u002Fp>\u003Cp>\u003Cbr>\u003C\u002Fp>\u003Ch2>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">Conclusion\u003C\u002Fspan>\u003C\u002Fh2>\u003Cp>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">The best way to control apartment renovation expenses is to plan everything carefully in advance. Define the scope of work, prepare a step-by-step list, calculate labor and material costs separately, obtain several comparable quotes, and request a detailed estimate.\u003C\u002Fspan>\u003C\u002Fp>\u003Cp>\u003Cbr>\u003C\u002Fp>\u003Cp>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">Do not forget to include delivery, waste removal, post-construction cleaning, and other additional expenses. Keep a financial reserve within the overall budget and make payments according to completed stages of work.\u003C\u002Fspan>\u003C\u002Fp>\u003Cp>\u003Cbr>\u003C\u002Fp>\u003Cp>\u003Cspan style=\"background-color: transparent; color: rgb(31, 31, 31);\">A good renovation budget does not necessarily have to be the lowest. It should be realistic, understandable, and manageable. When the scope of work, prices, and responsibilities of each party are agreed upon in advance, the likelihood of unexpected expenses, project delays, and disputes during the renovation is significantly reduced.\u003C\u002Fspan>\u003C\u002Fp>","\u002Fcontent\u002Fuploads\u002Fnews\u002F1389e2d9-36d7-4a38-918c-964612e719bf.webp","\u002Fcontent\u002Fuploads\u002Fnews\u002Fthumbnails\u002F1389e2d9-36d7-4a38-918c-964612e719bf.webp","Pexels",null,"2026-08-17 17:01:00","2026-08-17 17:54:08",481,{"title":68,"slug":69},"Journal","journal",[71],{"title":72,"slug":73},"Mortgage","mortgage",{"first_name":75,"last_name":76,"full_name":77,"avatar":78,"email":79,"slug":80,"company":81,"phone":63,"title":82,"description":83,"position":84,"position_description":85,"social_links":86},"Saty","Avagyan","Saty Avagyan","\u002Fcontent\u002Fuploads\u002Favatars\u002Fe5bf46158b2222c21e51fcf6ac6ebd5f.webp","content.creation.05@gmail.com","saty-avagyan","AFM","About the author","\u003Cp>\u003Cspan style=\"background-color: transparent; color: rgb(0, 0, 0);\">A content and content strategy specialist with over 7 years of experience working with leading Armenian and international companies. She has collaborated with major Armenian banks and financial products, and since early 2024 has been an author at AFM, responsible for creating analytical and up-to-date content that is valuable for both readers and search engines and AI systems.\u003C\u002Fspan>\u003C\u002Fp>","Head of Content Marketing and Author of Articles and News at AFM","\u003Cp>Responsible for all content across the website from quality standards to the creation and updating of materials.\u003C\u002Fp>",[87],{"name":88,"link":89,"status":90},"linkedin","https:\u002F\u002Fwww.linkedin.com\u002Fin\u002Fsaty-avagyan-642028274\u002F",1,[],{"title":93,"description":94,"keywords":95},"Apartment Renovation Budget: How to Estimate Costs","How to calculate your apartment renovation budget and avoid unexpected costs? Step-by-step guidelines on estimates, contingency funds, and Turn.am on AFM.",[],{"left":5,"top":5,"width":30,"height":30,"rotate":5,"vFlip":7,"hFlip":7,"body":97},"\u003Cpath fill=\"currentColor\" d=\"M5 19v-8.692q0-.384.172-.727t.474-.565l5.385-4.078q.423-.323.966-.323t.972.323l5.385 4.077q.303.222.474.566q.172.343.172.727V19q0 .402-.299.701T18 20h-3.384q-.344 0-.576-.232q-.232-.233-.232-.576v-4.769q0-.343-.232-.575q-.233-.233-.576-.233h-2q-.343 0-.575.233q-.233.232-.233.575v4.77q0 .343-.232.575T9.385 20H6q-.402 0-.701-.299T5 19\"\u002F>",{"left":5,"top":5,"width":30,"height":30,"rotate":5,"vFlip":7,"hFlip":7,"body":99},"\u003Cpath fill=\"none\" stroke=\"currentColor\" stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"m9 18l6-6l-6-6\"\u002F>",{"left":5,"top":5,"width":101,"height":101,"rotate":5,"vFlip":7,"hFlip":7,"body":102},14,"\u003Cg fill=\"none\">\u003Cpath fill=\"currentColor\" d=\"M7 11.529c-4.33 0-6.475-4.135-6.562-4.31a.51.51 0 0 1 0-.437C.525 6.607 2.669 2.494 7 2.494s6.475 4.113 6.563 4.288a.51.51 0 0 1 0 .437c-.088.175-2.231 4.31-6.563 4.31M1.444 7c.481.81 2.363 3.544 5.556 3.544S12.075 7.81 12.557 7C12.075 6.191 10.194 3.457 7 3.457 3.807 3.457 1.925 6.19 1.444 7\"\u002F>\n    \u003Cpath fill=\"currentColor\" d=\"M7 8.86A1.86 1.86 0 0 1 5.14 7c0-1.028.832-1.86 1.86-1.86S8.86 5.973 8.86 7 8.027 8.86 7 8.86m0-2.735A.88.88 0 0 0 6.125 7c0 .481.394.875.875.875A.88.88 0 0 0 7.875 7 .88.88 0 0 0 7 6.125\"\u002F>\u003C\u002Fg>"]